Questions? +1 (202) 335-3939 Login
Trusted News Since 1995
A service for global professionals · Friday, March 29, 2024 · 699,654,983 Articles · 3+ Million Readers

Bovanenkovskoye field’s final gas facility and Ukhta – Torzhok 2 gas pipeline brought into operation

Release

Today, an official ceremony was held at the Bovanenkovskoye field to celebrate the commissioning of the field’s third and final gas production facility and the Ukhta – Torzhok 2 gas trunkline.

The ceremony was attended by Alexey Miller, Chairman of the Gazprom Management Committee, Dmitry Artyukhov, Governor of the Yamal-Nenets Autonomous Area, and heads of the Company’s relevant subdivisions, subsidiaries and contracting organizations.

Vladimir Putin, President of the Russian Federation, greeted the participants via a conference call.

The Yamal gas production center has strategic importance, as it will assume the primary role in the national gas industry throughout the 21st century. In a mere ten years, Gazprom created a powerful industrial complex at the Bovanenkovskoye field, building transport (including a railroad and an airport) and utility infrastructure in the severe Arctic conditions of the Yamal Peninsula from the ground up.

In 2012, Bovanenkovskoye’s gas production facility No. 2 came onstream, followed by gas production facility No. 1 in 2014.

Today, gas production facility No. 3 was brought into operation. The facility includes, inter alia, a gas treatment unit with the annual capacity of 30 billion cubic meters of gas. As a result, the field has reached its design production capacity of 115 billion cubic meters of gas per year.

Gas from Yamal is delivered to consumers via the gas pipelines of the northern gas transmission corridor, which is becoming the key route of Russia’s Unified Gas Supply System (UGSS). Since 2012, the Company has brought onstream the state-of-the-art and highly efficient Bovanenkovo – Ukhta, Ukhta – Torzhok and Bovanenkovo – Ukhta 2 gas pipelines within this corridor. Today, the Ukhta – Torzhok 2 gas pipeline was connected to the UGSS. The new gas pipeline is 970 kilometers long and has a design throughput of 45 billion cubic meters of gas per year.

For its development operations in Yamal, Gazprom employs advanced technological solutions and highly reliable equipment. For instance, every facility at Bovanenkovskoye operates with the help of modern automation systems and lightly manned technologies. Particular attention is paid to maintaining a high level of industrial safety and preserving the natural environment of the Arctic. To that end, the use of vapor-liquid heat stabilizers and heat-insulated pipes in wells helps minimize impacts on the permafrost.

The domestically-produced pipes used in the Ukhta – Torzhok 2 gas pipeline are made of cold-resistant steel and protected from corrosion by special long-life external insulation. The pipes also have internal coating that makes gas transmission more efficient.

“The commissioning of the third production facility at Bovanenkovskoye is a landmark event for the Russian gas industry. Now, the main field in Yamal has all of its key facilities up and running. Gas production operations will continue here until 2128. We have made yet another step toward achieving the government-mandated goal of creating the main Russian gas production center in the Arctic,” said Alexey Miller.

Background

In December 2008, Gazprom began implementing the Yamal megaproject by welding the first joint of the Bovanenkovo – Ukhta gas pipeline and drilling the first producing gas well at the Bovanenkovskoye field.

Bovanenkovskoye – the backbone of the Yamal gas production center – is the largest field in the Yamal Peninsula in terms of explored gas reserves. At the start of development in 2012, its initial gas reserves were estimated at 4.9 trillion cubic meters.

The field’s actual gas production rates are gradually increasing, thus reflecting the market demand. In 2017, gas production from Bovanenkovskoye amounted to 82.8 billion cubic meters.

Construction of the Ukhta – Torzhok 2 gas pipeline started in 2015.

 

Information Directorate, Gazprom

Contacts for media 

+7 812 609-34-05 +7 812 609-34-31 +7 812 609-34-26

pr@gazprom.ru

Contacts for investors

+7 812 609-41-29 ir@gazprom.ru

Powered by EIN Presswire
Distribution channels: Companies


EIN Presswire does not exercise editorial control over third-party content provided, uploaded, published, or distributed by users of EIN Presswire. We are a distributor, not a publisher, of 3rd party content. Such content may contain the views, opinions, statements, offers, and other material of the respective users, suppliers, participants, or authors.

Submit your press release